FW04 — Profile Leveling and Longitudinal Profile Development

I — Project Details

ItemRecord
Fieldwork / ProjectFW04 — Profile Leveling and Longitudinal Profile Development
LocationUniversity Campus — Proposed Access Alignment
Date / TimeSeptember 24, 2026; 1:00–4:00 PM
Group / SectionGroup 1 / CE Surveying
Stations0+000 to 0+100 at 20 m intervals
Start BenchmarkBM-A = 100.000 m
Closing BenchmarkBM-B = 98.420 m
Assigned Design Grade-1.20%
Weather / GroundPartly cloudy; dry alignment

II — Survey Team and Equipment Used

A — Survey Team

MemberAssignment / DescriptionRemarks
Student AParty ChiefNone
Student BLevel OperatorNone
Student CRod PersonNone
Student DRecorderNone
Student EStationing / Centerline AssistantNone
Student FSafety ObserverNone

B — Equipment Used

Equipment / InstrumentID / DescriptionQuantityRemarks
Automatic LevelLV-021Compensator checked
Leveling RodLR-05; metric1Serviceable
Steel TapeST-04; 30 m1Used for stationing
Turning PlateTP-Plate-011Stable
Station StakesP-000 to P-1006Labels visible
PPE SetHigh-visibility vest and closed shoes6Complete

III — Project Sketch and Photo Documentation

A — Project Sketch

FW04 — Longitudinal Profile

B — Google Maps Location Points

Point / AreaMap RecordPurpose / Limitation
BM-A and BM-BVerified pins and WGS84 coordinates required in actual reportGeographic recovery context
Proposed alignmentMarked Google Maps route required in actual reportShows site orientation and access
Profile stationsField stationing and level-book recordEngineering stationing remains authoritative

No fictional geodetic coordinates are assigned to this illustrative dataset.

C — Photo Documentation — Dedicated Page

Reserve one complete report page for the embedded original images represented by this register.

PhotoImage FileDescription
1FW04-photo-01.jpgCenterline stationing and labeled profile stakes
2FW04-photo-02.jpgBacksight on BM-A and instrument setup
3FW04-photo-03.jpgIntermediate sight at a principal station
4FW04-photo-04.jpgTurning-point procedure and closing observation on BM-B

IV — Observations and Data

A — Raw Level Notes

SetupPointStationBS (m)IS (m)FS (m)HI (m)Raw Elev. (m)
I-01BM-AControl1.400——101.400100.000
I-01P-0000+000—1.250——100.150
I-01P-0200+020—1.540——99.860
I-01P-0400+040—1.890——99.510
I-01TP-A0+050——2.050—99.350
I-02TP-A0+0501.200——100.55099.350
I-02P-0600+060—1.280——99.270
I-02P-0800+080—1.620——98.930
I-02P-1000+100—1.950——98.600
I-02BM-B Close0+110——2.127—98.423

B — Adjusted Profile Data

StationRaw Ground (m)Correction (m)Adjusted Ground (m)Design Grade (m)Ground − Grade (m)Interpretation
0+000100.15000.000000100.1500100.000+0.150Cut
0+02099.8600-0.00054599.859599.760+0.099Cut
0+04099.5100-0.00109199.508999.520-0.011Fill
0+06099.2700-0.00163699.268499.280-0.012Fill
0+08098.9300-0.00218298.927899.040-0.112Fill
0+10098.6000-0.00272798.597398.800-0.203Fill
BM-B 0+11098.4230-0.00300098.4200——Control closure

V — Computations and Assumptions

Closure check:

e=98.423−98.420=+0.003 m=+3 mme=98.423-98.420=+0.003\text{ m}=+3\text{ mm} ∣e∣allow=120.110=3.980 mm|e|_{\mathrm{allow}}=12\sqrt{0.110}=3.980\text{ mm}

The run is accepted because 3 mm<3.980 mm3\text{ mm}<3.980\text{ mm}. Corrections are distributed by cumulative distance:

Cd=−0.003(d110)C_d=-0.003\left(\frac{d}{110}\right)

The assigned grade elevation at distance xx metres from Sta. 0+000 is:

Eg(x)=100.000−0.012xE_g(x)=100.000-0.012x

At Sta. 0+080:

Eg(80)=100.000−0.012(80)=99.040 mE_g(80)=100.000-0.012(80)=99.040\text{ m} Eground−Eg=98.9278−99.040=−0.1122 m≈−0.112 mE_{\mathrm{ground}}-E_g=98.9278-99.040=-0.1122\text{ m}\approx-0.112\text{ m}

Assumptions and conventions:

  • BM-A and BM-B elevations are fixed controls.
  • The assigned tolerance is 12K12\sqrt{K} mm with KK in kilometres.
  • Misclosure is distributed by cumulative alignment distance.
  • Positive ground-minus-grade indicates cut; negative indicates fill.
  • The longitudinal profile may use a disclosed vertical exaggeration for legibility, while tabulated elevations remain true values.

VI — Remarks and Conclusions

A — Remarks

  • Profile stations were treated as intermediate sights; TP-A received the foresight and subsequent backsight.
  • Raw and adjusted elevations remain separate.
  • Rod plumbing, stationing, turning-point stability, and unequal sight length are probable error sources.
  • Cut/fill interpretation is longitudinal only; volume requires cross-sections.

B — Conclusion

The profile run closed with +3 mm, within the ±3.980 mm assigned tolerance. Relative to the -1.20% design grade, cut occurs at 0+000 and 0+020, while fill dominates from 0+040 through 0+100. The adjusted elevations are accepted for the longitudinal profile.