RW06 — Preliminary Engineering Site Reconnaissance Using Google Earth and Google Maps
Project Brief
Site Reconnaissance Summary
Proposed Preliminary Control
Proposed Survey Coverage
Field Mobilization Priorities
- Verify access permission and pedestrian/traffic conditions.
- Inspect proposed CP locations for stability and intervisibility.
- Confirm benchmark/control references before collecting detail.
- Walk the drainage corridor and terrain breaks before finalizing point density.
- Adjust the traverse and detail-survey plan based on actual visibility and hazards.
Digital Evidence to Attach
Limitations
Desktop reconnaissance cannot confirm property rights, precise elevations, hidden utilities, current site hazards, monument condition, line-of-sight obstructions, or survey-control validity. All proposed observations must be verified on site before field operations proceed.
Conclusion
The desktop review identifies workable preliminary access, likely control locations, a drainage-sensitive southeast area, and several features requiring denser field observation. The recommended field plan combines closed horizontal control, differential leveling, and detailed total-station coverage, subject to on-site verification.
Submission: Handwritten RW due on the next meeting with the required annotated digital maps printed and attached.