Value Engineering - Theory & Concepts - Construction Methods And Project Management Function Cost Trainer

A systematic and organized approach to providing the necessary functions in a project at the lowest cost.

Open the complete lesson

Function, Cost, and Value Index Trainer

The core principle of Value Engineering is to maximize the Value Index by optimizing the ratio of Function\text{Function} to Cost\text{Cost}. Adjust the sliders to see how improving function or reducing cost impacts the overall value.

Parameters

100

A relative measure of performance, quality, or utility.

$500,000

The life-cycle cost required to achieve the function.

The Value Equation
Value=FunctionCost\text{Value} = \frac{\text{Function}}{\text{Cost}}
Value=100500000=2.00e4\text{Value} = \frac{100}{500000} = 2.00e-4
Value Index (Scaled per $1k)
0.200

Higher values indicate a better return on investment for the required function.